Publications

Journals

  1. S. Tanaka, S. Boge, S. Knust (2026): The parallel stack loading problem: Polynomial solvability in the unlimited-capacity case and exact approaches for the finite-capacity case
    European Journal of Operational Research   DOI:10.1016/j.ejor.2026.03.009
  2. S. Knust, M. Koch, X.T. Le (2025): Scheduling sports tournaments with two court types
    Discrete Applied Mathematics 376, 404-426.  DOI:10.1016/j.dam.2025.07.018
  3. J.-N. Buckow, M. Goerigk, S. Knust (2025): Integrated pallet retrieval and processing in warehouses under uncertainty 
    OR Spectrum 47, 817-855.   DOI:10.1007/s00291-024-00806-7
  4. J.-N. Buckow, M. Goerigk, S. Knust (2025): Retrieval optimization in a warehouse with multiple input/output-points
    OR Spectrum 47, 1-34.   DOI:10.1007/s00291-024-00775-x
  5. T. Brandt, C. Büsing, S. Knust (2024): Structural insights about avoiding transfers in the patient-to-room assignment problem
    Discrete Applied Mathematics 347, 231–248.    DOI:10.1016/j.dam.2023.12.025
  6. J.-N. Buckow, S. Knust (2023): The warehouse reshuffling problem with swap moves and time limit
    EURO Journal on Transportation and Logistics 12, 100113.    DOI:10.1016/j.ejtl.2023.100113
  7. S. Boge, S. Knust (2023): The blocks relocation problem with item families minimizing the number of reshuffles
    OR Spectrum 45, 395-435.   DOI:10.1007/s00291-022-00703-x
  8. J.-N. Buckow, S. Knust (2023): The warehouse reshuffling problem with swap moves
    Transportation Research Part E: Logistics and Transportation Review 169, 102994.   DOI:10.1016/j.tre.2022.102994
  9. T. Brandt, C. Büsing, S. Knust (2022): One transfer per patient suffices: Structural insights about patient-to-room assignment
    Lecture Notes of Computer Science 13526, 245-259.   DOI:10.1007/978-3-031-18530-4_18
  10. S. Knust, X.T. Le, N.T. Nga (2022): The gain of robustness for a storage loading problem
    Vietnam Journal of Mathematics 50, 1-27.   DOI:10.1007/s10013-020-00425-z
  11. T. Oelschlägel, S. Knust (2021): Solution approaches for storage loading problems with stacking constraints
    Computers and Operations Research 127, 105142.   DOI:10.1016/j.cor.2020.105142
  12. J.-N. Buckow, B. Graf, S. Knust (2020): The exponential multi-insertion neighborhood for the vehicle routing problem with unit demands
    Computers and Operations Research 120, 104949.   DOI:10.1016/j.cor.2020.104949
  13. S. Boge, M. Goerigk, S. Knust (2020): Robust optimization for premarshalling with uncertain priority classes
    European Journal of Operational Research 287, 191-210.   DOI:10.1016/j.ejor.2020.04.049
  14. S. Boge, S. Knust (2020): The parallel stack loading problem minimizing the number of reshuffles in the retrieval stage
    European Journal of Operational Research 280, 940-952.   DOI:10.1016/j.ejor.2019.08.005
  15. D. Meignan, S. Knust (2019): A neutrality-based iterated local search for shift scheduling optimization and interactive reoptimization
    European Journal of Operational Research 279, 320-334.   DOI:10.1016/ejor.2019.06.005
  16. S. Knust, N.V. Shakhlevich, S. Waldherr, C. Weiß (2019): Shop scheduling problems with pliable jobs
    Journal of Scheduling 22, 635-661.   DOI: 10.1007/s10951-019-00607-9
  17. M. Bultmann, S. Knust, S. Waldherr (2018): Synchronous flow shop scheduling with pliable jobs
    European Journal of Operational Research 270, 943-956.   DOI:10.1016/j.ejor.2018.04.024
  18. M. Bultmann, S. Knust, S. Waldherr (2018): Flow shop scheduling with flexible processing times
    OR Spectrum 40, 809-829.   DOI:10.1007/s00291-018-0520-8
  19. C. Büsing, S. Knust, X.T. Le (2018): Trade-off between robustness and cost for a storage loading problem: rule-based scenario generation
    EURO Journal on Computational Optimization 6, 339-365.   DOI:10.1007/s13675-018-0094-x
  20. S. Waldherr, S. Knust, D. Briskorn (2017): Synchronous flow shop problems: How much can we gain by leaving machines idle?
    Omega 72, 15-24.   DOI:10.1016/j.omega.2016.10.006
  21. S. Waldherr, S. Knust (2017): Decomposition algorithms for synchronous flow shop problems with additional resources and setup times
    European Journal of Operational Research 259, 847–863.   DOI:10.1016/j.ejor.2016.11.015
  22. X.T. Le, S. Knust (2017): MIP-based approaches for robust storage loading problems with stacking constraints
    Computers and Operations Research 78, 138-153.   DOI:10.1016/j.cor.2016.08.016
  23. C. Weiß, S. Waldherr, S. Knust, N.V. Shakhlevich (2017): Open shop scheduling with synchronization
    Journal of Scheduling 20, 557-581.   DOI:10.1007/s10951-016-0490-0
  24. C. Weiß, S. Knust, N.V. Shakhlevich, S. Waldherr (2016): The assignment problem with nearly Monge arrays and incompatible partner indices
    Discrete Applied Mathematics 211, 183-203.   DOI:10.1016/j.dam.2016.04.019
  25. J. Poppenborg, S. Knust (2016): Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers
    EURO Journal on Computational Optimization 4, 349-380.   DOI:10.1007/s13675-015-0061-8
  26. M. Kampmeyer, S. Knust, S. Waldherr (2016): Solution algorithms for synchronous flow shop problems with two dominating machines
    Computers and Operations Research 74, 42-52.   DOI:10.1016/j.cor.2016.04.010
  27. M. Goerigk, S. Knust, X.T. Le (2016): Robust storage loading problems with stacking and payload constraints
    European Journal of Operational Research 253, 51-67.   DOI:10.1016/j.ejor.2016.02.019
  28. J. Poppenborg, S. Knust (2016): A flow-based tabu search algorithm for the RCPSP with transfer times
    OR Spectrum 38, 305-334.   DOI:10.1007/s00291-015-0402-2
  29. F. Bruns, S. Knust, N.V. Shakhlevich (2016): Complexity results for storage loading problems with stacking constraints
    European Journal of Operational Research 249, 1074-1081.   DOI:10.1016/j.ejor.2015.09.036
  30. D. Meignan, S. Knust, J.-M. Frayret, G. Pesant, N. Gaud (2015): A review and taxonomy of interactive optimization methods in operations research
    ACM Transactions on Interactive Intelligent Systems 5.   DOI:10.1145/2808234
  31. S. Waldherr, S. Knust, S. Aust (2015): Message scheduling for real-time interprocessor communication
    Journal of Systems Architecture 61, 374-382.   DOI:10.1016/j.sysarc.2015.06.002
  32. S. Waldherr, J. Poppenborg, S. Knust (2015): The bottleneck transportation problem with auxiliary resources
    4OR - A Quarterly Journal of Operations Research 13, 279-292.   DOI:10.1007/s10288-015-0284-9
  33. S. Waldherr, S. Knust (2015): Complexity results for flow shop problems with synchronous movement
    European Journal of Operational Research 242, 34-44.   DOI:10.1016/j.ejor.2014.09.053
  34. M. Paul, S. Knust (2015): A classification scheme for integrated staff rostering and scheduling problems
    RAIRO Operations Research 49, 393-412.   DOI:10.1051/ro/2014052
  35. J. Lehnfeld, S. Knust (2014): Loading, unloading and premarshalling of stacks in storage areas: Survey and classification
    European Journal of Operational Research 239, 297–312.    DOI:10.1016/j.ejor.2014.03.011
  36. F. Bruns, M. Goerigk, S. Knust, A. Schöbel (2014): Robust load planning of trains in intermodal transportation
    OR Spectrum 36, 631-668.    DOI:10.1007/s00291-013-0341-8
  37. S. Waldherr, S. Knust (2014): Two-stage scheduling in shelf-board production: A case study
    International Journal of Production Research 52, 4078-4092.    DOI:10.1080/00207543.2013.809495
  38. C. Viergutz, S. Knust (2014): Integrated production and distribution scheduling with lifespan constraints
    Annals of Operations Research 213, 293-318.    DOI:10.1007/s10479-012-1197-z
  39. C. Artigues, P. Brucker, S. Knust, O. Kone, P. Lopez, M. Mongeau (2013): A note on ``Event-based MILP models for resource-constrained project scheduling problems''
    Computers and Operations Research 40, 1060-1063.   DOI:10.1016/j.cor.2012.10.018
  40. A. Condotta, S. Knust, D. Meier, N.V. Shakhlevich (2013): Tabu search and lower bounds for a combined production-transportation problem
    Computers and Operations Research 40, 886-900.   DOI:10.1016/j.cor.2012.08.017
  41. J. Poppenborg, S. Knust, J. Hertzberg (2012): Online scheduling of flexible job-shops with blocking and transportation
    European Journal of Industrial Engineering 6, 497-518.   DOI:10.1504/EJIE.2012.047662
  42. F. Bruns, S. Knust (2012): Optimized load planning of trains in intermodal transportation
    OR Spectrum 34, 511-533.   DOI:10.1007/s00291-010-0232-1
  43. S. Knust, E. Schumacher (2011): Shift scheduling for tank trucks
    Omega 39, 513-521.   DOI:10.1016/j.omega.2010.10.009
  44. A. Condotta, S. Knust, N.V. Shakhlevich (2010): Parallel batch scheduling of equal-length jobs with release and due dates
    Journal of Scheduling 13, 463-477.   DOI:10.1007/s10951-010-0176-y
  45. S. Knust (2010): Scheduling non-professional table-tennis leagues
    European Journal of Operational Research 200, 358-367.   DOI:10.1016/j.ejor.2009.01.015
  46. G. Kendall, S. Knust, C.C. Ribeiro, S. Urrutia (2010): Scheduling in sports: An annotated bibliography
    Computers and Operations Research 37, 1-19.   DOI:10.1016/j.cor.2009.05.013
  47. D. Briskorn, S. Knust (2010): Constructing fair sports league schedules with regard to strength groups
    Discrete Applied Mathematics 158, 123-135.   DOI:10.1016/j.dam.2009.08.006
  48. S. Knust, D. Lücking (2009): Minimizing costs in round robin tournaments with place constraints
    Computers and Operations Research 36, 2937-2943.   DOI:10.1016/j.cor.2009.01.004
  49. S. Knust (2008): Scheduling sports tournaments on a single court minimizing waiting times
    Operations Research Letters 36, 471-476.   DOI:10.1016/j.orl.2007.11.006
  50. A. Drexl, S. Knust (2007): Sports league scheduling: graph- and resource-based models
    Omega 35, 465-471.   DOI:10.1016/j.omega.2005.08.002
  51. S. Knust, M. von Thaden (2006): Balanced home-away assignments
    Discrete Optimization 3, 354-365.   DOI:10.1016/j.disopt.2006.07.002
  52. P. Brucker, S. Knust, C. Oguz (2006): Scheduling chains with identical jobs and constant delays on a single machine
    Mathematical Methods of Operations Research 63, 63-75.   DOI:10.1007/s00186-005-0014-8 
  53. P. Brucker, S. Knust, G. Wang (2005): Complexity results for flow-shop problems with a single server
    European Journal of Operational Research 165, 398-407.   DOI:10.1016/j.ejor.2004.04.010
  54. J. Hurink, S. Knust (2005): Tabu search algorithms for job-shop problems with a single transport robot
    European Journal of Operational Research 162, 99-111.   DOI:10.1016/j.ejor.2003.10.034
  55. P. Brucker, T.C.E. Cheng, S. Knust, N.V. Shakhlevich (2004): Complexity results for flow-shop and open-shop scheduling problems with transportation delays
    Annals of Operations Research 129, 81-106.   DOI:10.1023/B:ANOR.0000030683.64615.c8
  56. P. Baptiste, P. Brucker, S. Knust, V.G. Timkovskyu (2004): Ten notes on equal-processing-time scheduling
    Quarterly Journal of the Belgian, French and Italian Operations Research Societies (4OR) 2, 111-127.   DOI:10.1007/s10288-003-0024-4
  57. P. Brucker, S. Knust (2003): Lower bounds for resource-constrained project scheduling problems
    European Journal of Operational Research 149, 302-313.   DOI:10.1016/S0377-2217(02)00762-2
  58. P. Brucker, J. Hurink, S. Knust (2002): A polynomial algorithm for P | pj=1, rj, outtree | sum Cj
    Mathematical Methods of Operations Research 56, 407-412.   DOI:10.1007/s001860200228
  59. P. Brucker, S. Knust (2002): Lower bounds for scheduling a single robot in a job-shop environment
    Annals of Operations Research 115, 147-172.   DOI:10.1023/A:1021149204501
  60. P. Brucker, S. Heitmann, S. Knust (2002): Scheduling railway traffic at a construction site
    OR Spectrum 24, 19-30.   DOI:10.1007/s291-002-8198-0
  61. P. Brucker, C. Dhaenens-Flipo, S. Knust, S.A. Kravchenko, F. Werner (2002): Complexity results for parallel machine problems with a single server
    Journal of Scheduling 5, 429-457.   DOI:10.1002/jos.120
  62. J. Hurink, S. Knust (2002): A tabu search algorithm for scheduling a single robot in a job-shop environment
    Discrete Applied Mathematics 119, 181-203.   DOI:10.1016/S0166-218X(01)00273-6
  63. J. Hurink, S. Knust (2001): Makespan minimization for flow-shop problems with transportation times and a single robot
    Discrete Applied Mathematics 112, 199-216.   DOI:10.1016/S0166-218X(00)00316-4
  64. J. Hurink, S. Knust (2001): List scheduling in a parallel machine environment with precedence constraints and setup times
    OR Letters 29, 231-239.   DOI:10.1016/S0167-6377(01)00104-3
  65. P. Brucker, S. Knust (2000): A linear programming and constraint propagation-based lower bound for the RCPSP
    European Journal of Operational Research 127, 355-362.   DOI:10.1016/S0377-2217(99)00489-0
  66. P. Brucker, S. Knust, D. Roper, Y. Zinder (2000): Scheduling UET task systems with concurrency on two parallel identical processors
    Mathematical Methods of Operations Research 52, 369-387.   DOI:10.1007/s001860000089
  67. P. Brucker, S. Knust (1999): Complexity results for single-machine problems with positive finish-start time-lags
    Computing 63, 299-316.   DOI:10.1007/s006070050036
  68. P. Brucker, S. Knust, A. Schoo, O. Thiele (1998): A branch and bound algorithm for the resource-constrained project scheduling problem
    European Journal of Operational Research 107, 272-288.   DOI:10.1016/S0377-2217(97)00335-4

Books and book chapters

  1. P. Brucker, S. Knust (2012): Complex Scheduling, 2nd edition,   Springer, ISBN 978-3-642-23928-1.    Web site    DOI:10.1007/978-3-642-23929-8
  2. P. Brucker, S. Knust (2006): Complex Scheduling,   Springer, ISBN 978-3-540-29545-7.    Web site
  3. S. Knust (2015): Lower bounds on the minimum project duration
    in: C. Schwindt, J. Zimmermann (eds.): Handbook on Project Management and Scheduling, Vol.1, International Handbooks on Information Systems,   Springer, 43-55.    DOI 10.1007/978-3-319-05443-8_3
  4. S. Knust (2011): Scheduling of tournaments or sports leagues
    in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler, H. Vollmer, D. Wagner (eds.): Algorithms Unplugged,    Springer, 267-275.     DOI:10.1007/978-3-642-15328-0_27
  5. S. Knust (2011): "Diskret" optimierte Pläne im Alltag
    in: K. Wendland, A. Werner (eds.): Facettenreiche Mathematik - Einblicke in die moderne mathematische Forschung,    Vieweg+Teubner, 257-272.
  6. P. Brucker, S. Knust (2009): On the complexity of scheduling
    in: Y. Robert, F. Vivien (eds.): Introduction to Scheduling, Chapman and Hall/CRC Press.   CRC Press, 1-21.
  7. S. Knust (2008): Turnier- und Sportligaplanung
    in: B. Vöcking, H. Alt, M. Dietzfelbinger, R. Reischuk, C. Scheideler, H. Vollmer, D. Wagner (eds.): Taschenbuch der Algorithmen,    Springer, 275-284.
  8. P. Brucker, S. Knust (2000): Scheduling
    in Theme 6.5. Optimization and Operations Research, edited by U. Derigs, in Encyclopedia of Life Support Systems   (EOLSS) developed under the auspices of the UNESCO, Eolss Publishers, Oxford, UK.
  9. P. Brucker, S. Heitmann, S. Knust (2004): Scheduling railway traffic at a construction site
    in: H.-O. Günther, K.H. Kim (eds.): Container Terminals and Automated Transport Systems Logistics Control Issues and Quantitative Decision Support,   Springer.
  10. P. Brucker, S. Knust (2001): Resource-constrained project scheduling and timetabling
    in: E.Burke, W.Erben (ed.): The Practice and Theory of Automated Timetabling III, Springer Lecture Notes in Computer Science Vol. 2079, 277-293.
  11. T. Baar, P. Brucker, S. Knust (1998): Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
    in: S.Voss, S.Martello, I.Osman, C.Roucairol (eds.): Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization, Kluwer, 1-18.
  12. P. Brucker, S. Knust (1998): Solving large-sized resource-constrained project scheduling problems
    in: J.Weglarz (ed.): Project Scheduling: Recent Models, Algorithms and Applications, Kluwer, 27-51.